Major Projects - Completed & Ongoing

     

S.NO

DESCRIPTION

Date of Completion

Status

Client, Project Location

71

Maaden Pipeline Maintenance Project (450KM) for 3 years. Maintenance of pumps station, pipe line and inline valves.Contract Value: SAR 18M

 

Ongoing

Maaden Gold, Taif, KSA

70

GRE/RTR Piping fabrication, installation, hydro testing and re-commissioning.Contract Value: SAR 9M

 

Ongoing

KCC, HARAD Compressor stations.

69

Marafiq GE 7FA frame unit , auxiliary scopeoverhauling of 28 pumps and motors for 4 units GT21,GT22, GT22 and GT33. Contract Value: SAR 7.7M

19 Dec 2017

Ongoing

GE, Marafiq IWPP , Jubail

68

Removal & Reinstallation of Waste heat Boiler and Super Heater.

Initial Acceptance 30 Jan 2017

Completed

Raised sulphate acid factory ,Jubail

67

24”water pipe Saudi Aramco Re-Route Pipeline in Ras Tanura of 41 KM to rastanura.Contract Value: SAR 7.7M

 

Ongoing

Saudi Aramco Re-Route Pipeline in, Ras Tanura CPP

66

Repair and replacement of firewater pipe line and drinking water pipe line near chlorination building of Desalination area. Work include civil , mechanical and piping (RTRP)Contract Value: SAR 14.5M

 

Ongoing

Marafiq IWPP, Plant,Jubail, Client JOMEL

65

Design Engineering & Construction Lump sum for Furnace & Rail foundation Contract Value: SAR 1.1M

 

Ongoing

NATCO Al-Rushaid Middle East Ltd

64

Constructing the new entrance gate with security room & Access road to Marafiq IWPP Contract Value: SAR 1.5M

 

Ongoing

JWAP,Jubail

63

HRSG Thermocouple installation testing & Commissioning Contract Value: SAR 190K

 

ongoing

JWAP,JUBAIL

62

Fence installation ,HVAC, testing commission Ning, skylight repairing, civil backfilling, compaction, & asphalt work. Contract Value: SAR 1.5M

18-May-18

Completed

KIDMAH LLC KHOBAR

61

GRE/RTR Piping fabrication, installation , hydro testing and recommissioning Contract Value: SAR 8M

Initial Acceptance  

Completed

Fadili gas plant project , KCC/TR

60

TP8 form piping, Pump house, and fire water head installation works. GRE/RTR and FRP

18-Mar-18 

Completed

Pan Gulf industrial Systems, Marafiq Jubail

59

Sprinkler systems installation in 5 plants SWTP9,TP8,nwps, SWC and control room

10-Oct-17

Completed

Pan Gulf industrial Systems, Marafiq Jubail

58

TP9 Pump house construction, civil foundation, Structural works, roof, door and lovers.

10-Apr-18 7

Completed

Pan Gulf industrial Systems, Marafiq Jubail

57

Fire water Upgradation project at Marafiq TP8  including trench preparation, pipe laying, fire hydrants installation  commissioning.GRE/RTR and FRP.Contract Value: SAR 14.8M

2-Feb-16

Completed

Pan Gulf industrial Systems, Marafiq Jubail

56

Steel structural errection work arrond 700 tons in critical area. In addition, grating and light structure.Contract Value: SAR 2.3M

 

Ongoing

KCC, Safco 4 rehabilitation and revamp project

55

Replacement of piping spool works air liquid plant Qurayyah

24-Feb-16

Completed

FS Elloitt, Qurayyah

54

Tank foundation preparation at Sea water cooling area

20-Jan-16

Completed

Pan Gulf industrial Systems, Marafiq Jubail

53

Fire water Upgradation project at Marafiq NWPS including trench preparation, pipe laying, fire hydrants installation  commissioning GRE/RTR and FRP

 

Ongoing

Pan Gulf industrial Systems, Marafiq Jubail

52

SEC Scaffolding contract for boiler,hrsg, and steam turbine for major outages (eastern province). Contract Value: SAR 3.5M

 

Ongoing

Saudi Electric Company

51

Relocation of Fire cabinet main control panel, testing and commission   in GTG units

18-Dec-15

Completed

General Electric, Qurayyah CCPP

50

Additional cabling work including testing  from GTE mark Vi panel to Generator Collector Cab Main Control Panel in 18 GTG units. Contract Value: SAR 3.2M

11-Nov-15

Completed

General Electric, Qurayyah CCPP

49

GT#2 painting  and concrete column repair work  including tools  and equipment’s

7-Oct-15

Completed

Atlantic projects, Qurayyah CCPP

48

Scaffolding erection for dismantling and reinstallation of GT#2 pipe rack insulation work

1-Oct-15

Completed

Atlantic projects, Qurayyah CCPP

47

Excavation, reinforcement, preparation and casting of 53 concrete foundation for installation rigging separator, MOVs, pipe support, nitrogen tank, liquid fuel tank etc.Contract Value: SAR 1.8M

20-Sep-15

Completed

KAOFU technical Services, berry gas station, Jubail

46

site facility and Lay down preparation, porta cabin installation, foundation casting, trech preparation for cable laying,

15-Sep-15

Completed

KAOFU technical Services, berry gas station, Jubail

45

Fire water Upgradation project at Marafiq SWTP#9  including trench preparation, pipe laying, fire hydrants installation  commissioning

11-Jul-15

Ongoing

Pan Gulf industrial Systems, Marafiq Jubail

44

PDB relocation, cable tray erection, Cable pulling, Testing and Termination work 

12-Apr-15

Completed

Crown international, Dammam industrial Area

43

 

Cable tray erectrion works

6-Apr-15

 Completed

Aljohran Contracting, SWCC , Alkhobar

42

Maintenance Team for underground piping work  

22-Mar-15

Completed

Maaden Pipe line Project  Taif

47

Modification of Stackor area structural & mechanical work

15-Mar-15

Completed

Eastern province Cement Co.

41

Scaffolding erection for dismantling and reinstallation of Air in let duct filter

3-Mar-15

Completed

Atlantic projects, Qurayyah CCPP

40

Scaffolding erection for dismantling and reinstallation of Bypass stacks,Pipe racks

20-Feb-15

Completed

Atlantic projects, Qurayyah CCPP

38

Scaffolding erection  for gas turbine Major outages

5-Dec-15

Completed

General Electric, PP-3 Power  plant Jeddah

35

HVAC Ducting work at Sabic technology center

5-Aug-14

Completed

Sabic

34

 Construction of Switchgear room

10-Aug-15

Completed

Hyundai Heavy Industries , JSTP Jeddah

33

Installation of sump pump including foundation preparation

7-Aug-15

Completed

Hyundai Heavy Industries , PP_11 Riyadh

32

380KV S/C OHTL inter connection of IRRQAA (#9034 BSP to # 9002 S/S and IRRQAA (#9034) to #9004 S/S

10-Jun-15

Completed

GS Engineering PP12, Riyadh

31

RTRP pipe Line work installation of 18"main header and hydrotesting.

2-May-14

Completed

Maaden Pipe line Project  Taif

30

Scaffolding work for GTE shut down work at Makkah power plant

17-Mar-14

Completed

PP_3 power plant Jeddah

29

33.5KV substation building inside plant civil , HVAC, plumbing and electrical works

15-Mar-15

Completed

Chemnol,Saudi Arabia

28

Scaffolding work for GTE shut down work at Makkah power plat

2-Feb-14

Completed

Makkah Power Plant

27

Fiber Glass reinforce Plastic Butt & wrapping work

15-Jan-14

Completed

Ramoz Al Thumiz Company,RC Jubail

26

 GTG Modification work , collector cab ventilation upgradation project

1-Feb-14

Completed

Saudi Electrical Company, Faras Power Plant Udaliya

25

Installation of sump pump including foundation preparation and preparation and installation of duct bank, Manhole

9-Oct-13

Completed

Hyundai Heavy Industries , PP_11 Riyadh

24

GTG Modification work , collector cab ventilation upgradation project

1-Nov-13

Completed

Saudi Electrical Company,Qurrayah PP1 &2

23

 Fuel gas Buffer Modification project

4-Feb-14

Completed

Hyundai Heavy Industries , PP_11 Riyadh

22

Renovation of old interlock , 50000 Sq feets Removal of old tiles and installation of new tiles

30-Jun-11

Completed

AARTCO. , Royal commission sanitary landsil expansion project.

21

Collector cab modification work for 12 Gas Turbine Generator

18-Oct-12

Completed

General Electric Inc.Marafiq IWPP

20

Repair work for stack welding inside the by stack of Gas Turbine generator

14-Oct-12

Completed

Braden LLC,Marafiq IWPP

19

 Scaffolding Errection for Installing the chiller Air condition unit to Gas turbine generator

2-Aug-12

Completed

Saudi Electrical Company,Qurayyah plant 1& 2,Udaliya

18

 Scaffolding Errection for Installing the chiller Air condition unit to Gas turbine generator

14-Mar-12

Completed

Saudi Electrical Company.

17

Lifting and transportation of  GTG rotor from Faras power to Dammam

12-Feb-12

Completed

General Electric Inc.,Faras Power Plant

16

Performance Heater Valves and pipe line modification on 12 Gas Turbine. Modification of Feed Water lines

30-Jul-12

Completed

General Electric Inc. Marafiq IWPP project

15

Transportation and removal of Transformer from Nasariya power plant to Milsa shop in Dammam for refurbishment

30-Apr-12

Completed

General Electric Inc,Nasariya SEC Plant

14

 

Platform installation on HRSG’

30-May-12

Completed

Doosan heavy industries, Marafiq IWPP

13

Erection of Scaffolding in 3 Stack for repainting of internal stacks. Area around 2500 m3 each up to height 40mts.

30-May-12

Completed

Technical Contracting Company, Al Jubail Power Plant

12

33.5KV substation building inside plant civil , HVAC, plumbing and electrical works and switch gear room

12-Aug-11

Completed

Hyundai Heavy Industries , PP_11 Riyadh

11

Scaffolding project 1 year complete contract for Steam turbine and Gas turbine Generator Inspection and Plant Outages in year 2010 and 2011 , Total 70,000 m3 area erected in different outages and units

17-Jun-11

Completed

General Electric Inc.

10

Site facilities preparation and Site offices(HVAC, Potable cabins and parking facilities installation for Independent Power Plant-11 in Dhurma

30-Jun-11

Completed

Sung Do  IPP-11.Dhurma, Riyadh

9

SCR Probe Access Platforms on 12 Gas Turbines at elevation of 28 Mts height, Access includes ladder, grating, frames and handrails. 2 Sqmts structural Steel platform erected with 100 ton crane

15-Jul-10

 Completed

General Electric Inc. Marafiq IWPP project

8

Renovation of old interlock , 50000 Sq feets Removal of old tiles and installation of new tiles

30-Jun-11

Completed

AARTCO. , Royal commission sanitary landsil expansion project.

7

Cable trench excavation, back filling, asphalt cutting, conducting, cable pooling, fiber optic cable erection work, installing of Security system, fencing work

12-Jun-11

Completed

THALES ,Khursaniyah AFK project,

11

 

380kV Transmission Line from Jubail 380/230 kV SS. To Maaden 380kV Sub Station

30-Jun-08

Completed

Al Masa Group company, Jubail Maaden.

6

Modification of Stack Silencer, removal and installation silencer splitter of 3.1 M from stack of 90M height and welding of supports 20mm think CS plates. 3 Stacks

30-May-11

Completed

Technical Contracting Company, Al-Jubail Power Plant.

5

Iso-phase bus duct pressurization system modification, Installation of tubing’s, relief Valves, intersection drain valves, control panels, solenoid valves, control cabling, commissioning and Testing.  On 12 Gas Turbines and 4 Steam Turbines

15-Dec-11

Completed

General Electric Inc. Marafiq IWPP project

4

Neutral Grounding Transformer repair and replacement of earthing cables and NGT to Bushing box termination and Installation on 4 Steam Turbines

1-Dec-11

Completed

General Electric Inc. Marafiq IWPP project

3

Excitation Cooling Fan power segregation  from Switch Gear room to Excitation compartments 480 V 3 core cable 6KM in 12 Gas turbines and 4 Steam turbines

4-Mar-11

Completed

Jubail O&M Company Marafiq IWPP

2

Fiber Optic Cable Laying and Termination from Mark IV panel to Gas chromatograph panel and Panel installation, commission and Testing.(Modification in Warranty period)

15-Jul-11

Completed

General Electric Inc, Marafiq IWPP Project

1

Civil  and installation work 

21-Mar-11

Completed

Thales Co.

       
           
     
 
 
 