Engineers & Constructors
 
two EPC Construction
two Civil /Architectural
two Steel Structural
two Building Work
two Equipment Erection Work
two Fabrication
two Piping Division
two Non-Metalic Piping
two Electrical & Instrumentation
 
 
 
 
 
       

 Major Projects - Completed & Ongoing

       
     

S.NO

DESCRIPTION

Date of Completion

Status

Client, Project Location

1

Scaffolding Erection for plant outages

30th Sep 2011

Completed

Shedgum Gas Plant

2

Fiber Optic Cable Laying and Termination from Mark IV panel to Gas chromatograph panel and Panel installation, commission and Testing

15 July 2011

Completed

General Electric Inc, Marafiq IWPP Project

3

Excitation Cooling Fan power segregation  from Switch Gear room to Excitation compartments 480 V 3 core cable 6KM in 12 Gas turbines and 4 Steam turbines

04 March 2011

Completed

Jubail O&M Company Marafiq IWPP

4

 

Neutral Grounding Transformer repair and replacement of earthing cables and NGT to Bushing box termination and Installation on 4 Steam Turbines

01 Dec 2010

Completed

General Electric Inc.

Marafiq IWPP

5

Iso-phase bus duct pressurization system modification, Installation of tubing’s, relief Valves, intersection drain valves, control panels, solenoid valves, control cabling, commissioning and Testing.  On 12 Gas Turbines and 4 Steam Turbines

15  Dec 2011

Completed

General Electric Inc.

Marafiq IWPP

 7               

Modification of Stack Silencer, removal and installation silencer splitter of 3.1 M from stack of 90M height and welding of supports 20mm think CS plates. 3 Stacks

30 May 2011

Completed

Technical Contracting Company, Al-Jubail Power Plant.

8

Cable trench excavation, back filling, asphalt cutting, conduiting, cable pooling, fiber optic cable erection work, installing of Security system, fencing work

12 June 2011

Completed

THALES

Khursaniyah AFK project,

9

 

Renovation of old interlock , 50000 Sq feets Removal of old tiles and installation of new tiles

30 June 2011

Completed

AARTCO. , Royal commission sanitary landsil expansion project.

10

SCR Probe Access Platforms on 12 Gas Turbines at elevation of 28 Mts height, Access includes ladder, grating, frames and handrails. 2 Sqmts structural Steel platform erected with 100 ton crane

15 July 2010

 Completed

General Electric Inc.

Marafiq IWPP

11

Site facilities preparation and Site offices(HVAC, Potable cabins and parking facilities installation for Independent Power Plant-11 in Dhurma

30 June 2011

Completed

Sung Do  IPP-11.Dhurma, Riyadh

12

Scaffolding project 1 year complete contract for Steam turbine and Gas turbine Generator Inspection and Plant Outages in year 2010 and 2011 , Total 70,000 m3 area erected in different outages and units

17 June 2011

Completed

General Electric Inc

Marafiq IWPP

13

Erection of Scaffolding in 3 Stack for repainting of internal stacks. Area around 2500 m3 each up to height 40mts.

30 May 2012

Completed

Technical Contracting Company, Al Jubail Power Plant

14

Transportation and removal of Transformer from Nasariya power plant to Milsa shop in Dammam for refurbishment

30 April 2012

Completed

General Electric Inc

Nasariya Power Plant

15

Performance Heater Valves and pipe line modification on 12 Gas Turbine. Modification of Feed Water lines

30 July 2012

Completed

General Electric Inc.

Marafiq IWPP

16

Lifting and transportation of  GTG rotor from Faras power to Dammam

12 Feb 2012

Completed

General Electric Inc.

Faras Power Plant

17

Scaffolding Errection for Installing the chiller Air condition unit to Gas turbine generator

14 March 2012

Completed

Saudi Electrical Company.

Qurayyah Power Plant

Qurayyah 2

18

Scaffolding Errection for Installing the chiller Air condition unit to Gas turbine generator

2 Aug 2012

Completed

Saudi Electrical Company

Faras Power Plant

Udaliya

19

Repair work for stack welding inside the by GT Exhaust duct Stack

14 Oct 2012

Completed

Braden LLC

Marafiq IWPP

20

Collector cab modification work for 12 Gas Turbine Generator

18 Oct 2012

Completed

General Electric Inc.

Marafiq IWPP

21

Renovation of old interlock , 50000 Sq feets Removal of old tiles and installation of new tiles

30 June 2011

Completed

AARTCO. , Royal commission sanitary landsil expansion project.

22

Fuel gas Buffer Modification project

4th Sep 2013

Completed

Hyundai Heavy Industries , PP_11 Riyadh

23

GTG Collector Cabinet ventilation modification,It include installation of compressor skid ,APU skid ,piping ,foundation , cabling between skid and PEECC ,control loop testing and commissioning.

Total on 18 Gas turbine units

 

On going

Saudi Electrical Company

Qurayyah Power Plant

Qurayyah 2

24

Installation of sump pump including foundation preparation and preparation and installation of duct bank, Manhole

 

On going

Hyundai Heavy Industries , PP_11 Riyadh

25

GTG Collector Cabinet ventilation modification,It include installation of compressor skid ,APU skid ,piping ,foundation , cabling between skid and PEECC ,control loop testing and commissioning.

Total on 4 Gas turbine units

 

On going

Saudi Electrical Company

Faras Power Plant

Udaliya

26

Scaffolding work for GTE shut down work at Makkah power plat

 

On going

Makkah Power Plant

27

Scaffolding work for GTE shut down work at Makkah power plat

 

On going

PP_3 power plant Jeddah

28

Maaden Pipeline project (valve Chambers Installation),Scope arround 250 chambers each consist of 6 adhesive and keylock joints .RTRP Piping Works.

 

On going

Maaden Pipe line Porject  Taif

 
           
     
 
 
 